Translate

Showing posts with label Westerwoldse Aa. Show all posts
Showing posts with label Westerwoldse Aa. Show all posts

Friday, 20 June 2014

Tuesday 17th June 2014 Wedde to De Dellen 29kms 2 locks.

14.2°C Sunny spells with lots of white clouds, strong North wind. Set off at 9.05 am reversing
from wooden staging to wind and return back downstream on the Westerwoldse Aa.
Mooring at Wedde
Immediately the clegs found us, repellent on and swatters out. Past the little windmill (a water pump) and the banks lined with Giant Hogweed as we passed the offline basin where the trip boats were moored at Wedderveen; on past the islands and the chalets, caravans and tents, then out into open countryside with wide water meadows, reed beds and boggy land with rushes. Lapwings flew up from the fields and a solitary Egyptian goose took off. Round the new bends where the reed beds had encroached where the Veendeip came in from the right, then the channel became wider and
Windmill water pump
deeper with higher banks (no views across the fields) where sheep and lambs grazing. We’d moored several times in the past next to an empty roof-high quay at Langebrug, a lovely isolated quiet mooring in the middle of nowhere – but not today. Under more low fixed bridges at around 2.5m air draught, so the mast stayed flat on the roof. Turned sharp left, heading West on the Winschoterdiep and pressed the button on the wooden baulks below Bulsterverlaat to empty the lock. Once it was empty and we had a green light we went into the chamber on the right hand side only to find the chain to pull and activate the lock was in the ladder slot on the left hand side. A nifty bit of manoeuvring by Mike and I could reach to yank the chain. The lock was a bigger one at 5.8m wide by 40m long. We rose only 0.6m. The Winschoterdiep was much wider and a metre deeper at 3.5m than the previous navigation. Still no traffic on it though. The noisy A7 followed the right bank, filled with lorries, just 4kms from the German border. A buzzard soared above and grebes were diving, a pair of goldeneye ducks flew off in front, but the mallards stayed put. Mike had forgotten all about the rail swingbridge and it
Lock activation button Bulsterverlaat
was fast approaching midday so we slung a rope on the timber posts expecting a two hour wait during the keeper’s lunch break. A two-car Arriva train went across then a young man walked across from his portacabin office and I shouted we thought you’d be gone to lunch, he waved. He opened the bridge for us and we found we were now behind a loaded commercial which had just come from the Rensel haven, an arm off to the left in Winschoten. Noted there had been a new yacht harbour excavated off to the right at Oldambtmeer making a crossroads with the Rensel. We followed Weslie from Ten Boer to Beertsterbrug liftbridge and a small cruiser appeared and
Bulsterverlaat lock, emptying
circled around behind the commercial. The latter attached his bow to the timber posts by the bridge and we hovered as there was nowhere to tie up while the bridge keeper had his lunch break. The wind blowed every whichway and we were broadside across the canal most of the time, the cruiser went alongside the bank that was constructed of rock gabions. At 1 pm we followed the other two through the liftbridge with long queues of road traffic waiting while we went through. Waved to the bloke in the control cabin
Yank the chain and the lock works!
and trundled on for 2kms behind the big boat to Kloosterbrug. A lady keeper this time and she had the bridge up ready for the commercial. Another 2kms to Graaf Adolfsbrug with our lady keeper officiating. Likewise, she pressed the buttons in the cabin to lift Eexterbrug and we continued through the open floodlock where a piling gang were working. Went slowly, letting the commercial get ahead as we were not continuing along the Winschoterdiep, the cruiser followed it until we slowed right down to sweep right under a low bridge on to the Opdiep
Following Weslie and a cruiser through
the liftbridges on Winschoterdiep
leading into the town of Scheemda. The cruiser winded to follow us (he’d missed the junction). Under a wooden footbridge, passing new flats and houses and a large offline marina and I hopped off to lift the bridge while Mike stayed back. The cruiser came alongside him. It took me a few minutes to realise that the instructions on the bridge said to keep pressing the buttons! Mike did the sharp left turn under the bridge followed by the cruiser and I lowered the bridge then walked down to the lock passing another cruiser. I
Moored by the windmill De Dellen
said sorry I didn’t realise they were waiting for the bridge, they could have come through before I lowered it. Mike by this time had our boat in the schutsluis (back to small locks - 6m wide by 25m long) and the cruiser went in ignoring Mike’s miming of “turn the key in the slot before you come in”. The lock light was still red, so they had to back out and put the key in and turn it before the power pack started up to operate the lock. They pulled the cord and we dropped down 2m. Wished them a good trip as they were carrying on to Nieuwolda, completely forgetting there were a couple of bridges to operate. Round a sharp right hand bend on to the Termunsterzijldiep, now heading North, and it was just a short distance to Zwaagsterklap liftbridge. The lady off the cruiser had got the bridge open (and a long queue of road traffic was fast forming) and we started to follow the cruiser through the bridge - except she pressed the button to drop the bridge – Mike gave a toot on the hooter and the bridge
Giant hogweed
stopped going down. As we passed them we said we’d work the next bridge for them. OK. It was only a few hundred metres to Tichelwaardsdraai swingbridge. Waited until they were close behind us and I opened the bridge which had manually operated barriers (it only led to a boat workshop) and an electrically operated bridge. She said that she’d hit the stop button and had only to pull it back out again before the bridge carried on working! We wished the crew a good journey as they went past and Mike followed them through the bridge, then paused to pick me up after I’d closed it – I had one van waiting to cross the bridge. Under the busy A7 motorway and 1.5kms to the mooring by the windmill called De Dellen, built in 1854 it worked for 133 years before being retired in favour of a small electric water pump! Someone had left an old wooden canoe tied in the middle of the mooring, we went in front of it with our bows a couple of metres beyond the end. Mike put a pin in the bank to hold the bows steady in the ever-blowing North wind. It was 3.30 pm.


Monday, 16 June 2014

Saturday 14th June 2014 Veerlveen to Wedde. 14.4kms 1 lock


Windmill at Veelerveen
12.9°C Grey start then sunny spells with increasing numbers of white clouds. Wind picking up from breezy to very windy by the time we’d tied up. Mike and I got up at 8 am and had breakfast then he moved the car to Wedde and walked back - 6kms!! He returned at 11.15 am. I made a cuppa. As it was breezy Mike suggested that I walk to the bridge, which I did. Veelervensterbrug was fully automatic, just press two buttons – bridge up and bridge down – and one each way for the traffic lights. Soon on our way again, passing the first windmill on our way to Vriescheloostersluis. The name of the canal had changed to B. J. Tijdens kanaal.  Two men on cycles stopped to watch us lock through. Key in the slot on a post on one of the wooden posts for tying to, turn
Groenesluis - straight through today - a flood lock
it and take it out and the lock worked – bottom end gates closed and the lock filled, top end gates opened and we went in – I pressed the green button on a post and the gates closed behind us, paddles up and we soon dropped down 1.5m. Bottom end gates opened and there were two small open motor boats waiting to come up. Mike took the mast off and laid it on the roof as the rest of the bridges were fixed ones and lower than the height of the mast at 3.4m, averaging about 2.5m. The canal was straight and had a cycle path on the left and a busy minor road on the right. After a short distance we
Groenesluis - looking back to T-junction
turned left on to the Veendiep expecting to have to work a lock but found Groenesluis. a flood lock, had both sets of gates standing open – no need to stop! The canal beyond was narrow with high banks on both sides and rocks edging the right bank. I made sandwiches for lunch. Left again when we came the junction with the Westerwoldse Aa, now a much broader river channel edged with reeds between water meadows with grazing cows. A harrier carrying lunch for its nestlings flew low across the reeds. A few lapwings flew across the navigation. Under several more low fixed bridges and we went into a wooded area where there was a yacht
Moored on Westerwoldse Aa at Wedde
harbour at Wedderveer among the islands in the river. Another offline basin was filled with trip boats. The banks were lined with holiday homes, chalets, bungalows, caravans and tents, either they were all watching the football (World Cup has just started in Brazil) or nobody was home. Under one more low bridge and there was an empty basin with one large gent fishing. The banks of the river were sprouting large stands of Giant Hogweed. We reached the head of navigation at Wedde at 3 pm and tied to a wooden staging – the wind was directly from behind and blowing us off the staging so a nifty bit of rope work and we were snugly tied up.