Translate

Showing posts with label Elbe-Havel-Kanal. Show all posts
Showing posts with label Elbe-Havel-Kanal. Show all posts

Tuesday, 6 May 2014

Tuesday 6th May 2014 Parey to Rothensee by the shiplift. 29.4kms 2 locks.

5.6°C Sunny and warmer when we set off at 8.40 am, but turning hazy later and a chilly
Traffic leaving Zerben lock (two boats on left)
wind picked up again. A Polish loaded boat called Luisa Lynn from Szczecin (80m x 8m 855T) had slowed down by the moorings, so we set off towards Brandenburg then winded to follow it once two boats coming the opposite way had cleared the un-widened section; Nawa9 (originally Undine in embossed letters under the new paint) a loaded (920T) 80m boat also from Szczecin and a tug (called Edrich) and pan. Surprised that we easily kept up with the loaded boat. It was going slowly through the narrow section, which was being prepared for widening – large sloping banks were set back a further 20m or
A linnet sitting on a perching post for birds of prey
more from the canal. At Zerben schleuse we had to wait for downhill traffic to clear the old lock (a new one was under construction alongside it) a tug pushing a loaded pan, then an 80m empty – which immediately it had cleared the lock started overtaking the tug and pan – then a large fast cruiser overtook both! Mayhem for a few minutes. We followed Luisa in to the lock, its crew attached fore end to the right wall and stern end to the left. It was a four bollard lift as it was 5.3m deep, we moved the ropes up the bollards as the lock filled. The Polish boat’s deck hand called us past as we left the lock – there was traffic coming through the narrow section above
Luisa Lynn in Zerben lock
the lock that he had to wait for. A pan loaded with scrap cars pushed by a Bizon tug, also from Szczecin, went past. Regina W, a loaded tanker (80m x 9m 1045T) went past at the start of the next widened section. It wasn’t long before Luisa’s skipper wound the power on and went past us just before where a bend of the canal had been cut off at KP340. As we went under the road bridge to Parchau a very large gentleman went past, paddling a slender kayak with an outrigger, South Sea

Islander style. The next downhill boat went past at KP336, an empty called Barbuda, it was
Following tripper into Hohenwarthe shaft lock
the first Belgian flagged boat we’d seen for a long time. The new moorings they’d installed in Burg town back in 2005 were looking very sad. The end designated for sport boats had two wooden benches and a set of posh concrete semi-circular steps down from the bank above – the walls all around had been covered with graffiti and litter, obviously the local youth hangout. The next downhill boats went past, Hornhafen (86m x 9m 1500T) an empty tanker followed by a Dutch cruiser, then a loaded 80m boat called Hanka from Hamburg followed by another cruiser, whose crew were
With all these bollards in 18.5m lift (15) ->
videoing us. Smile and say cheese. A small trip boat came out from the Niegripper verbindungskanal (access channel via a lock to the R Elbe) and went past us and winded, then overtook us as we were approaching the twin shaft locks at Hohenwarthe. We tied on the end of the moorings by the intercom and Mike spoke to the lock keeper, a young man who spoke reasonable
I'm glad we had a pair of floaters to tie to
English – he said OK to follow the tripper into the lock and he would call us when the lock was ready. Two cruisers came out of the left hand chamber (the right hand one was indisposed again) the first was a large British cruiser (wow, two in two days!) and a German yacht. The young man came on the intercom to tell us OK to follow the trip boat and we went into the empty chamber and tied to floaters numbered seven and eight as instructed. We rose slowly 18.5m. An empty 80m boat called Leopard was
Moored above Rothensee ship lift. Mittelland kanal.
waiting above to come down the lock. It was very windy as we went along the new canal and on to the aqueduct (Mike checked via the radio on channel 26 that it was OK for us to cross, the young man said he’d check, yes, OK – Mike said thanks for his help) An empty pan was moored just beyond the end of the aqueduct (the link which was planned during WWII and called projekt 17) and also an empty Czech boat, Labe24 (79mx9m 1183T). We turned the corner to the canal leading to Rothensee shiplift and moored after the trippers on the corner and a large German cruiser called Tina II. On the opposite bank there was a large Dutch hotel ship called Princess – passengers having a day out in Magdeburg, we wondered? Shortly after we’d tied up the tripper went down the shiplift, doing the circuit with another bus load of passengers.

Sunday, 4 May 2014

Sunday 4th May 2014 Neuendorf to Parey KP349 EHK 38kms 1 lock

An empty commercial on the Plauersee


5.1°C A cold night. Grey skies, no rain but cold with a westerly wind. Untied at 7.10 am and set off down the Breitlingsee and into the Plauersee. We passed a 65m empty called Moka heading for Brandeburg halfway across the Plauersee and a 65m called Janet, loaded with wood chips, at the north end of the Wendsee, our last lake in Germany. A sign by the bridge in Kirchmoser marked the start of the Elbe-Havel-Kanal (EHK) with Kilometre Post 380, as it is classed as an extension to the Mittelland Kanal – 380 kilometres and five locks to the junction with the Ems Kanal, it really feels like we’re leaving Germany now. We
Below Wusterwitz lock on Elbe-Havel-Kanal
stopped below Wusterwitz lock on the new pontoon for sport boats at 8.35 am. The new chamber on the left was blocked off with a small pan across the entrance and the intercom didn’t work by the startplatz. Mike called the lock keeper on the radio – and got an answer. The old lock chamber on the right started to empty. A loaded Bromberger came out of the lock then the keeper called us in, he spoke a little English. There were two boats moored below the lock, an empty called Magda and Luca loaded with scrap metal. We stayed at the back end of the chamber (225m long x 12m wide)
Hotel boat Sans Souci overtaking at Gethin EHK
using fore and aft ropes going up three bollards inset into the brick walls and rose gently 4.3m. The keeper has to walk all the way to the top end gates to use the controls there (and back to operate the bottom end gates and paddles) and as we left I asked how long it would be before the new lock opens, he shrugged and said he didn’t know. As we left Navtrans IV, loaded with soil, was waiting to go down. The next boat, a loaded tanker called Marlene2, was about five minutes away from the lock when we passed it. The keeper held the lock for him. I made a cuppa. Mike lit the coal fire, saying that we should have lit it the night before, but it had been such a warm afternoon we didn’t notice the evening outside temperature plummeting. There was a fishing
Tug pushing workboats. EHK
contest just finishing on the left bank by a couple of houses called Kader Schleuse around KP368. As we were passing the fishermen, three men in kayaks paddled past followed by two small cruisers and a loaded 80m tanker called Christoph, the latter had its radar revolving. Shortly after another Bromberger went past and six cruisers. Die Bromel, a loaded 57m boat (that’s a very short one for here!) went past at KP368. As we started going through the town of Genthin Mike set the Internet antenna up for me and I went in to chat with Yvonne on Skype for an hour at 11.30 am, just as 125m long hotel ship Sans Souci overtook us. At KP361 an 80m
Moored at Parey. KP349 EHK
boat called Marlies, loaded with a thousand tonnes of slack, went past. An empty called Vorwärts went past just before we tied up at Parey at KP349. The hotel boat Sans Souci was moored on the commercial mooring in Parey while their guests were eating lunch. We didn’t think hotel boats stopped for meals. It was 1.30 pm. Gave Mike a hand with the bike and he went to collect the car from Schmergow.